She/her please.

Author of https://fosswars.thecomicseries.com/

  • 4 Posts
  • 24 Comments
Joined 7 days ago
cake
Cake day: November 7th, 2026

help-circle







  • Thank you for an insight from someone that actually seems to understand what’s going on. My stomach twisted and turned as I signed a contract for General Dynamics because I had to eat. They won’t let you poison it because they need a measurable good part or assembly at the end of it. Small changes can easily affect small tolerances. “Oh just do it sloppily!” absolutely does not hold up to scrutiny when they have CMMs measuring what you’ve done vs. what they see. If I have to hold a good tolerance of 0.002" they will measure and with that along with finishes etc. they will know it is not up to snuff.





  • This is hard to describe, but I will try on this broken phone. I can’t turn on the machine for less than $75 per hour. This is due to the way things get quoted like my time, materials etc. Buy also since it is purely bid and contract based, good luck getting to pay yourself more than $20 an hour overall. The steady contracts simply will not pay you more. This also by the hour, fixed - not a quote per job and that is a massive difference.








  • There are generic CNC emulators. They’ve been around for a long time (like 15 years, as you said). The difference is that that they will do the grunt work, but a human needs to make the tool paths actually viable. The difference is that with actual professional tools like MasterCAM, it has been cutting out that intern for just as long but a cost of thousands of dollars per seat. What this has the potential to do, if I do it correctly, is even push out those incredibly expensive MasterCAM seats. I could cost hundreds of thousands of jobs if I do this correctly.