• tyler@programming.dev
    link
    fedilink
    arrow-up
    15
    ·
    3 days ago

    Five minutes? It should take about 30 seconds to run numerous gallons through. I think project farm was testing hose nozzles and he was getting 5 gallons in less than a minute.

    • YiddishMcSquidish@lemmy.today
      link
      fedilink
      English
      arrow-up
      5
      ·
      3 days ago

      God I want to like him so bad! Like he tests all the stuff that’s right up my alley. But I can not stand his voice and jumpy editing.

      • MBech@feddit.dk
        link
        fedilink
        arrow-up
        2
        ·
        3 days ago

        Just looked him up. He reminds me too much about the tv-shop salespeople. Kinda yelling at me, speaking really fast and stopping just a bit too long after the end of a sentance.

        Idk, might be super cool though.

      • tyler@programming.dev
        link
        fedilink
        arrow-up
        1
        ·
        3 days ago

        I’ve mostly stopped watching, right around the time I stopped buying so much shit I don’t need, but I did see him testing the hose sprayers like that which is why I mentioned him.